Twelve checks · any installer · including us

Run this against us. Especially us.

Solar in Pakistan has a documented fraud problem. A Senate panel found over Rs 110 billion of fraud and money laundering across solar imports by 80 companies, and the FBR has filed cases against fake solar firms. Separately, a practitioner account written from Faisalabad documented a steady stream of rooftop thefts across the city.

Those are not arguments against solar. They are arguments for the twelve checks below. Tick them off on your phone, or print the page and take it to the site visit. Section three applies this list to us, including the two places we do not come out cleanly.

01 — The list

Twelve checks.

The "How" line under each one is the part most people skip. A check you cannot perform is not a check.

0 of 12 checked

02 — Money

The structure we ask for, so you have something to compare against.

Common in this market

  • Advance50–100%
  • Paid before anything is deliveredShould be nothing, or only materials already on your roof
  • Final paymentOn the day of installation

What we ask for

  • Advance30%
  • Paid againstAn itemised quote and an NTN invoice
  • Second40% on delivery of equipment
  • Final 30%After commissioning and handover
What the final third is actually for. It is released only when the system has been shown to you working. That is the single most effective protection in this list, because it is the only point at which you can still walk away without losing everything.

03 — Applying it to us

Two places we do not come out cleanly.

A checklist you cannot run against yourself is marketing. Here is ours, point by point, including the two that we would rather you did not read.

Our answers to the twelve checks, as of 30 September 2026
#CheckOur answer
1Panel manufacturer and modelNamed in writing on the quotation. We will not pre-commit to a brand here, because stock and pricing move and we would be quoting you something we cannot deliver.
2Inverter manufacturer and modelNamed in writing, with the warranty length in years. The inverter is where we will spend more of your money than most sellers do.
3Itemised quotationYes. Modules, inverter, mounting structure, cable, switchgear and labour, separately.
4Price per wattWe give you a total for your site, not a per-watt rate. A per-watt price hides the structure and cable work, which is where the differences actually are.
5No zero-bill promiseConfirmed. We quote the fixed charges that will remain.
6Quoted under current rulesYes. Sized to your sanctioned load under Regulation 3(2), and we explain the export economics before you commit.
7Advance 30% or less30 / 40 / 30, as set out in section two.
8NTN invoiceEvery payment, against an invoice in the company's name.
9Performance clauseIn the quotation, before any money moves.
10Local after-sales number0347-4666664 and 0337-4666664. Faisalabad numbers, not a call centre. Ring them before you sign.
11No "Tier-1"Confirmed. We do not use the phrase about anything.
12Running work to visitYes — and we go further: ask us for an address and call the owner yourself.

Disclosure one. For some time our social pages pointed at a domain that was never registered, and the email address on that domain could not receive mail. We have since published the email address FESCO lists for us in its register of certified installers. If you had tried to reach us before, that is why it failed.

Disclosure two. The AEDB certificate we can evidence expired on 8 June 2025, and the FESCO list was published in April 2026 with that date still showing. We print it as it stands. See our certification record for the full entry and what we can and cannot claim from it.

Run the list on us, then run it on the next quotation.

If you would rather compare three quotes than take ours, do that. Send all three back and we will tell you which one is wrong and why.

WhatsApp Call