On 9 February 2026 NEPRA's Prosumer Regulations 2026 came into force and replaced net
metering in Pakistan. If you own or are buying solar, this is the single most important
change to your bill since the industry started. It is also the one most installers still
have not caught up with.
01 — What changed
You still sell your surplus. You are just paid far less for it.
Net metering, until 9 February 2026
Your export was worthYour full retail tariff
A 7.5 kW system on a 5 kW connectionWas legal — it is exactly the 1.5× maximum
Agreement term7 years
Old connections signed before 9 FebruaryKeep their 7-year term — but see below, they are not protected on price
Net billing, from 9 February 2026
Your export is worthAbout Rs 11 a unit
A 7.5 kW system on a 5 kW connectionIs not legal — Reg 3(2) allows 5 kW, no more
Agreement term5 years
Old connections signed before 9 FebruaryAre moved onto the national average price too — Reg 21(2)
NEPRA, Prosumer Regulations, 2026, notified as S.R.O. 251(I)/2026 and published in
the Gazette of Pakistan. Regulation 14(1)(a) sets import at the applicable tariff;
Regulation 14(1)(b) sets export at the national average energy purchase price; Regulation 3(2)
caps capacity at the sanctioned load; Regulation 21 repeals the 2015 Net Metering Regulations
with savings for existing agreements. Schedule-I of the regulations sets the ceiling at
"1 kW to 1MW".
Where the "Rs 11" actually comes from. The figure widely quoted is a
Power Division statement, not a line in the gazette. The gazette does not set a number; it
sets a formula — the national average energy purchase price — and
Regulation 14(3) allows NEPRA to revise that rate during the life of your agreement. We
use Rs 11 in our tool because it is the best current estimate, and we say so rather than
presenting it as a fixed price.
02 — Your side of the deal
What you pay, on FESCO's published rates.
This is the number that did not change. You buy power at your full tariff, exactly as
before. Every unit your array makes while you are using power is worth the whole thing.
FESCO residential, commercial and industrial energy rates effective 12 February 2026, plus the agricultural rate used in our model
Category
Rs per unit
What this means for solar
Home, unprotected, over 700 units
47.20
The best self-consumption value in the market. Size to your daytime load and never export.
Home, unprotected, 301–400 units
36.46
The common Faisalabad residential band.
Home, unprotected, 001–100 units
22.44
Low units, so a fixed array has less to displace.
Commercial
39.76
Strong value for shops that trade in daylight.
Industrial B2, 25–500 kW
24.16
Three-shift factories displace a great deal of this.
Agricultural
28.90
Tubewells only. Source is a practitioner report — check your own bill.
FESCO's published residential and commercial tariff schedule, effective 12 February 2026.
The agricultural figure could not be obtained from FESCO's own schedule and comes from a
practitioner source, so read the rate off your own bill before relying on it.
03 — A worked example
The same house, before and after 9 February.
A real Faisalabad shape: a home with a 7 kW sanctioned load using 400 units a month.
Under the old rules this household legally installed a 10 kW array, because 1.5×
was available. Every number below can be checked by you. Nothing here is hypothetical
except the name.
Worked at a flat Rs 47.20 per unit for both import and old-style export, so the
comparison isolates the rule change. A real slab bill differs slightly.
The arithmetic
Old rules
New rules
Array the household may install
10 kW (7 × 1.5)
7 kW (Reg 3(2))
Generated in a 30-day month at 4.20 kWh per kW per day
1,260 units
882 units
Used on site
400 units
400 units
Exported
860 units
482 units
Import you pay for, at Rs 47.20
Rs 18,880
Rs 18,880
Export credit
860 × 47.20 = Rs 40,592
482 × 11 = Rs 5,302
Monthly position
Rs 21,712 credit
Rs 13,578 owing
What February cost this household
Rs 35,290 a month
Notice that the array got smaller too. That is the half of this change
people miss. The Rs 11 export price is the part everyone argues about; the capacity cap is
the part that changes what you can physically put on a roof. A 10 kW array on a 7 kW
sanctioned connection was legal in 2025 and is not legal now. If a quotation you are holding
was written to the old rule, it is wrong on both counts.
Who this helps
Anyone whose consumption genuinely happens in daylight: shops, showrooms, offices,
three-shift factories. Their self-consumption stays above 80% of generation, and the
export rate barely touches them.
It also helps anyone who has not installed yet, because the bad outcome is entirely
avoidable by sizing correctly. The tool on our home page will show
you which side of that line you fall on before you commit to anything.
Who this hurts
Anyone who installed before February with a large array and low daytime usage. Under the
old rules the extra capacity was free money. Now it is sold at roughly a quarter of the
price.
It also hurts anyone still being sold the old maths. If a quotation in 2026 shows
you export cancelling your bill at full tariff, that quotation is describing a system that
was legal two years ago.
Generation assumes 4.2 kWh per kW per day, the figure used throughout this site and a
reasonable one for Faisalabad. The split between self-consumption and export follows a
standard daytime household load curve and is our model, not a measurement of any particular
house. Change the numbers yourself in the tool and the verdict changes
with them.
04 — How an application actually moves
Six steps, and your distribution company controls five of them.
We file the paperwork. We do not decide anything. Anyone who tells you they can "arrange"
approval is describing something that does not exist.
You apply, through PITC's portal
The application goes through the Pakistan Institute of Power Development and Services
at nmp.pitc.com.pk. Solar ICT is one of the parties designated
to file on a customer's behalf.
Acknowledgement within 5 working days
A stated minimum, not a promise. If nothing comes back in five working days, that is a
legitimate thing to chase.
Initial review within 15 days
The licensee checks capacity, meter and technical compliance. From 250 kW a load-flow
study is compulsory, carried out through the licensee or a consultant registered with
the Pakistan Engineering Council.
The 80% transformer gate
No new application is entertained if distributed generation on that transformer already
reaches 80% of its rated capacity. This is the rule that quietly blocks dense
commercial areas, and it is worth checking before you order.
Concurrence, then the connection letter
Seven working days each. Then the interconnection agreement, signed, with a five-year
term and an Rs 1,000 per kW fee.
One amendment that removed a gate
S.R.O. 1330(I)/2026 of 6 August 2026 states that a facility of 25 kW or below needs no
NEPRA concurrence. For most homes and small shops, that is one approval fewer than
there was in February.
Steps and day counts are the statutory minimums in S.R.O. 251(I)/2026. They are floors, not
typical elapsed times. Real-world timelines reported in this market run two to four months and
often longer, and a rejection restarts the clock. We do not promise you a date.
05 — The two-portal problem
There are two systems, not one, and it is not well explained anywhere.
System A
Net billing, via PITC
Portal:nmp.pitc.com.pk Used for: new net billing applications, filed by Solar ICT on your behalf or by you
directly.
This is the process set out above, under the 2026 regulations. It is the one every
quotation you have been shown is referring to.
System B
Connection management, via FESCO
Portal:fesco.enc.com.pk Used for: electricity connection number and consumer data — the part your
distribution company holds, not the part NEPRA holds.
Some customers, and some installers, submit to the wrong one. It is a common and entirely
avoidable delay.
If you already have solar, this is the part most people get wrong — including
some installers. The savings clause in Regulation 21(2) keeps your agreement
and its term alive. It does not keep your old price. The proviso is explicit:
existing distributed generation "shall be billed in accordance with the national average
power purchase price till the expiry of the term of their agreement." So your export is
already being valued on the same low basis as everybody else's, whether you upgraded last
month or in 2019.
Two things follow. First, if someone has told you that having an old connection protects your
export rate, that is not what the gazette says. Second, enlarging your system is a
different question again, because the protection attaches to the capacity you already had.
If your existing system works and your bill is acceptable, that is a genuinely different
decision from installing for the first time. Ask before you extend.
See what the change costs you, on your own numbers.
The tool on our home page is not a sales pitch. It shows what an array would make, how much
of it you would actually use, and what the February 2026 change costs. It will also tell you
when you have made the array too big.