3–25 kW
Homes and small shops
This is the bulk of Faisalabad. FESCO's own register shows 64% of the city's net-metered
connections are 5 kW or under, and 82% are 10 kW or under.
What it is for: displacing the units you use between roughly 8am and 5pm, at the
full tariff. Everything outside that window is where batteries come in.
What we check first: your sanctioned load, your roof orientation and shading, and
how much of your consumption actually happens in daylight. A lot of homes use more at
night than people assume, and for those the honest answer is often a smaller array plus a
small battery, or no solar at all.
Since 6 August 2026 a system of 25 kW or below no longer needs NEPRA concurrence
— your distribution company just has to approve it. One fewer gate between you and a
working system.
10–100 kW
Shops, offices and showrooms
These are the winners under the new rules. A shop that is lit, cooled and open
from 9am to 9pm uses a large share of its power in the sun. Every unit the array makes is
a unit it would otherwise have bought at Rs 39.76.
What it is for: carrying your air conditioning, lighting, refrigeration and
machinery through the trading day for free.
What we check first: the load profile by hour, not the monthly total. Shops on
generators are usually the best candidates in the city, because they can tell us exactly
what the generator was doing and when.
One caveat: if you are currently on a protected residential tariff, ask your
DISCO in writing how your tariff category is assessed once you are generating your own
power. It can be worth more than the solar.
100–250 kW
Factories, mills and institutions
Faisalabad runs on textile. Its power looms, dyeing and finishing units are heavy,
three-shift, process-heat loads — and dyeing in particular cannot be interrupted
mid-batch without losing the lot.
What it is for: displacing daytime process load, and, with storage, keeping the
line running through the evening peak when scheduled load shedding returns.
The rules are different here. At 250 kW and above a load-flow study is now
compulsory, carried out through the licensee or a consultant registered with the Pakistan
Engineering Council. And no new application will be entertained if distributed generation
on that transformer already reaches 80% of its rated capacity.
This is the top of the 250 kW range on our AEDB C-3 certificate. Our certificate covers
facilities up to 250 kW.
Batteries
Storage and backup
Two things happened at once. Net billing started paying far less for exported power, and
the Power Division reintroduced scheduled load shedding in April 2026 — around 2.5
hours a day, 5pm to 1am. Battery imports into Pakistan are up about 220% year on year.
What a battery is actually for now: moving your own generated energy past the
evening peak instead of selling it at Rs 11. That is the single most valuable thing a
battery does under the current rules.
What we check first: how many hours a day you actually need covered, and what
happens during a load-shedding window. A 5 kWh pack and a 20 kWh pack solve very different
problems and cost very different amounts.
For tubewells and homes in the villages around Faisalabad, storage and pumping
interact — see the farms page.